Question 32 — AB-900 Practice Exam 7
A team is about to let an agent write updates into a production ERP system. Before granting that ability, they want to preview exactly what the agent would change without making real edits. Which approach best fits this requirement? (Select one answer)
Disable all monitoring so the agent runs faster during production updates
Grant tenant-wide permissions so the agent has fewer failures
Run the agent in dry-run or simulation mode to preview behavior before enabling real changes
Switch the workflow to UI automation to reduce configuration needs
Correct answers
Run the agent in dry-run or simulation mode to preview behavior before enabling real changes
Explanations
Correct:
Run the agent in dry-run or simulation mode to preview behavior before enabling real changes
Dry-run/simulation mode is used to observe intended actions safely before allowing production-impacting changes.
Wrong:
Disable all monitoring so the agent runs faster during production updates
Monitoring is needed to control risk and detect issues.
Grant tenant-wide permissions so the agent has fewer failures
Broad permissions increase security risk and violate least-privilege best practices.
Switch the workflow to UI automation to reduce configuration needs
UI automation is described as fragile; stability is improved with safer designs and controls.